Project Description
Cyta Hellas Telecommunications S.A. – Edmondou Rostan Store – Thessaloniki
Construction work
Demolition and removal of existing buildings inside and outside of the store, dismantling plumbing and sanitation facilities, construction of plaster board dividing walls with mineral wool insulation, lining with plasterboard and mdf, false ceilings, flooring with pvc tiles, raised flooring, ceramic tiles, new shop window, new electric security roller, carpentry, paintings inside and outside the shop, new sewerage and plumbing installation, new sanitary products, curtain hiding an external air conditioner unit, outdoor neon sign.
Electromechanical works
Electrical installations, lighting, new main lighting switchboard and electric sockets, ups, voice-data, new alarm system, fire detection and access, air conditioning, channels for the installation of optical fibres.
Project Details
- Sales area:16m²
- Storage and auxiliary area:6m²
- Date:June 22, 2015