EKO YU – Novi Sad

ster&eko ns 055 newDiastasi - Novisad 2ster&eko ns 077

Project Description

EKO YU – Novi Sad

Construction works

  • Dismantlement, floors, false ceilings, electrical installations, air-conditioning), etalbond.

Surrounding area

  • Industrial floor, asphalt paving, hub, sewage drainage gullies, support walls, pavements, peripheral lighting, covered construction covers, special installations, volumetric analysis of tanks, hydraulic testing of tanks, installation of special tank covers, installation – connection of pumps, plumbing – electrical pump installation network.

Project Details

  • Gas station:120m²
  • Surrounding area:2.135m²
  • Date:January 11, 2015
  • 0
  • Share on: