Hellenic Recovery Recycling Corporation – Kerkyra

WP_20151118_13_49_53_Pro.jpKDAI KERKYRgNEW KDAI WP_20151118_18_18_25_ProWP_20151118_15_44_37_ProWP_20151118_11_24_51_ProWP_20151118_18_18_53_Pro

Project Description

Hellenic Recovery Recycling Corporation
RECYCLABLE MATERIAL SORTING CENTRE (RMSC) OF KERKYRA

 

CONSTRUCTION CABIN – AIR CONDITIONING – COOLING-HEATING EXPANSION / ADJUSTMENT VENTILATION AND DUST CONTAINMENT industrial building

 

Building works

  • Construction of steel structure from various profiles of merchant bars.
  • Supply and installation of polyurethane panels
  • Supply and installation of aluminium frames with glazing.

 

Mechanical Works

  • Αir conditioning and ventilation installation in the screening cabins consisting of aheating pump and central air units, ducts, openings and insulation
  • Reinstallation of ventilation fan controlled by inverter, new air ducts network
  • Installation of dust containment consisting of filter, fan, ducts, suction hoppers and dumpers

 

Electrical Works

  • Electrical Panels (Air Conditioning Panel, Lighting & Sockets Panel)
  • Lighting, Electrical and Fire Detecting installation.

 

Project Details

  • Date:November 23, 2015
  • 0
  • Share on: