Kikizas Industrial & Commercial S.A. – “Melissa” Pasta Industry – Larissa

Boiler room

  • Two 2,800,000 kcal/hr and 1,500,000 kcal/hr super- hot water boilers, connection collectors, steam barriers, safety features, piping networks, insulation, electrical panel.
    Super-hot water distribution system with twin pump complexes and suitable collectors (central networks).

Softening- Reserve osmosis

  • Reconstruction of twin pump complex for supplying boilers with reverse osmosis water, Two twins fully automated softening systems, 2m3 stainless steel tank.

Central piping networks

  • Supply networks for six macaroni making machines, insulations.

Works on the new BUHLER spaghetti producing machine

  • Super-hot water distribution system for the new BUHLER machine (local machine networks) using luffing-returning collectors, steam barriers, pumps, regulators, thermostatic vanes and various parts according to the blueprint of the BUHLER machine.
    Local piping networks for supplying super- hot and cold water.
    Steam distribution system using a steam generator, steam barriers, stainless steel piping network.
    Insulation of super-hot water, steam and cold water networks.
    Moist air exhausts system using stainless steel air ducts (AISI 304) and a central fan.

Works on the existing macaroni making machine (Braibanti)

  • Dismantling of old system.
    New high temperature water distribution system, (local networks), through luffing-returning collectors, steam stop valves, and other parts.
    High temperature and cold water piping networks and insulations.

Works in existing BRAIBANTI spaghetti producing machine

  • Dismantlement of old system.
    New super-hot water distribution system (local networks) using luffing- returning collectors, steam barriers and various parts.
    Super-hot and cold water piping networks, insulation of networks.
    Works concerning the existing noodle producing machine, as per BRAIBANTI machine.

FACILITY EXTENSION

Boiler room expansion

  • Dismantlement of existing 1,500,000 kcal /hr boiler, dismantlement of the entire boiler room, installation of new 2,800,000 kcal/hr boiler.
    New super-hot water distribution system for seven spaghetti producing machines with twin pump complexes and suitable collectors (central networks).
    12 m³ super-hot water expansion container with suitable operation automations.
    Hot water production boiler.
    Stainless steel steam production alternator using super-hot water to supply BUHLER machines; total steam production: 80kgr/hr.
    50m³ crude oil tank and 5m³ daily crude oil consumption tank.
    Crude oil networks from a 50m³ tank for daily consumption.
    New super-hot water piping connecting to boilers and to the distribution system.
    Insulation of networks, boiler tanks.

Works concerning the new BUHLER short macaroni producing machines, BRAIBANTI long pasta producing machines, noodle machines.

  • Super-hot water distribution system (local machine networks) using luffing- returning collectors, steam barriers, pumps, regulators, thermostatic vanes and various parts, according to the blueprint of the BUHLER machine.
    Local piping networks for supplying super-hot and cold water, stainless steel steam network using an alternator, insulation.
    Moist air exhausts system using stainless steel air ducts (AISI 304) and a central fan.

Construction of new engine room, (cold water production)

  • Dismantlement and transport of existing machinery to a new location.
    New 35RT air-cooled cooler.
    5m3 storage tank, two stainless steel plate alternators.
    Cold water distribution system for six spaghetti producing machines with twin pump complexes and suitable collectors, cold water recirculation system.
    Piping networks within cooling room.
    Insulation of piping networks, vanes, safety features, escapement valves, thermostatic vanes and various parts.
    Insulation of piping networks- storage tank.

Fire-extinguishing network

  • Complex reconstruction, fire-extinguishing network in the foreign distribution building.

Office-window heating

  • Office heating system with suitable luffing- returning collectors, circulators, vanes and various parts, window heating piping networks, insulation.

Iron constructions

  • Machinery bases, network supports and buttresses, lofts, loft visit staircase, metal frame for new cooling room and covering of cooling room metal frame.