Project Description
125m2 Fast Food restaurant in shopping center BIG CEE, Novi Sad Serbia
Steel Construction
– Steel construction for loft, pedestal for AHU unit, sub-frame for ducts and tray installation, sub-frame for false ceiling, steel counter construction
Construction works
– Floors (granite tiles, PVC floor coating), wall coverings (tiles, wooden covering) gypsum plaster walls, plastering, false ceiling (type Armstrong 60×60, 60×120, metal sheet boards 60×60), doors, sanitary equipment, furniture, wall covering with aluminum sheets.
Electromechanical works
– Water supply and sewage installation, AHU and duct installation, Hot Air exhaust system, electrical installations, lights, Main Distribution Board installation (type Mangelberger), UPS installation.
Project Details
- Date:January 20, 2015