Project Description
Temes S.A. – Costa Navarino
Construction of four independent two-storey buildings with a total surface of 3,331m²
Construction works
- Earthworks, steel construction frame and metallic body, external dry-walls and thermo-insulation façade, insulations, flooring with tiles and marbles, interior plasterboard walls, false ceilings, aluminum window frames and security doors, paintings, visible and closed wooden roofs, pergolas, wooden railings and decorative façade columns, ironworks, wooden frames and kitchen cabinets – wardrobes.
Surrounding area
- Excavations, land fillings, disabled ramps, sidewalk slabs, covering with perforated blocks, fencing, planting, asphalt covering of parking areas.
Electromechanical works
- Electrical installations, lighting, water supply network, sewerage installations, building and surrounding area lighting, fire detection system, air conditioning installation, lightning protection, weak currents, Data- Voice, elevators, irrigation, waste water treatment
Project Details
- Total surface:3,331m²
- Date:June 22, 2015